Our skilled engineers stand ready to help you develop pyrolysis plants and oil purification plants, or troubleshoot any challenges you face with existing operations. Our rich experience includes:
-
Engineering:
-
Over 47 pyrolysis plants in Asia, Africa and Europe
-
42TPD plant for the UK client
-
Pyrolysis Oil Distillation and Purification Plants
-
-
Troubleshooting:
-
50TPD Tyre Pyrolysis Plant for leakages from feed and discharge side
-
50TPD Biomass Pyrolysis Plant to solve the clogging problems
-
Given below is our proven approach to developing robust pyrolysis projects:
![Engineering-team.jpg](https://static.wixstatic.com/media/8e0f1d_375d34b3ad1a446bb2af1f0574dc942c~mv2.jpg/v1/fill/w_123,h_114,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_avif,quality_auto/8e0f1d_375d34b3ad1a446bb2af1f0574dc942c~mv2.jpg)
Phase I:
Expert Project Definition
-
Consultation and Expertise
-
Raw Material Due-Diligence
-
Pilots Plant Studies
-
Developing Proof of Concept (POC)
-
Regulatory & Sustainability Review
-
Tech Selection
-
Basis of Design (BEP)
-
Basic Engineering Package (BEP)
-
AACE Class 4 or 3 Cost Estimates
Phase II:
Ensuring Bankability
-
Technical & Financial Assessments
-
Permitting and Compliance
-
FEED (Front End Engineering Design) - Advanced Design & Safety
-
Environmental Impact Analysis
-
Building a Techno-Financial Model
-
Bank-ready Project Reports
![Business Consultation](https://static.wixstatic.com/media/11062b_d482f7fb62b04ae5a56d4235b94dac77~mv2.jpeg/v1/fill/w_123,h_82,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_avif,quality_auto/11062b_d482f7fb62b04ae5a56d4235b94dac77~mv2.jpeg)
![](https://static.wixstatic.com/media/8e0f1d_05d228ab3499420aa5ef89a5347000c3~mv2.jpg/v1/fill/w_123,h_68,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_avif,quality_auto/8e0f1d_05d228ab3499420aa5ef89a5347000c3~mv2.jpg)
Phase III:
Precision Engineering
-
Process & Mechanical Engineering
-
EC&I Engineering
-
2D/3D Design
-
HAZOP Studies
-
De-risking via Design Simulations
-
Process Simulations
-
Mechanical Simulations
-
-
Value Engineering
-
Procurement Management
Phase IV:
Seamless Construction & Commissioning
-
Tender & Contractor Selection
-
Supervised Construction
-
Mechanical Completion
-
Pre-Commissioning & Commissioning
-
Guarantee Test Runs
![](https://static.wixstatic.com/media/8e0f1d_1b36f583d7024ba99624a9d07deca0a9~mv2.jpg/v1/fill/w_123,h_92,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_avif,quality_auto/8e0f1d_1b36f583d7024ba99624a9d07deca0a9~mv2.jpg)
![](https://static.wixstatic.com/media/8e0f1d_027feaa038d544ef92e4ef10f09a4d90~mv2.jpg/v1/fill/w_123,h_72,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_avif,quality_auto/8e0f1d_027feaa038d544ef92e4ef10f09a4d90~mv2.jpg)
Phase V:
Sustainable Plant Growth
-
Optimization & Support
-
Remote Monitoring
-
O&M Services
-
Workforce Training
-
Tech Upgrades
-
Expansion Opportunities
-
Troubleshooting